| INFO REFERENCE | |
| TEAM | SILVIO PIOLA STADIUM |
| LOCATION | NOVARA |
| SPORT | Soccer |
| YEAR | 2010 |
In 2010, Italgreen had built the Silvio Piola stadium, and today, some 7 years later, the collaboration between the two entities continues with the construction and customization in synthetic grass of the entrance tunnel that connects the locker rooms to the playing field and the entrance area of the central grandstand.

Two areas outside of the competition that ignites sports matches, but that play a role nonetheless fundamental within a football facility and demonstrate how the 'synthetic grass is an optimal solution, not only to ensure favorable game performance for players, but also to go to beautify and make pleasant seemingly marginal areas.

The choice of Novara Calcio is configured as a strategic solution, which will give new pride to the sports facility already renovated 7 years ago with a major intervention, costing approximately 600,000 euros, which Italgreen had taken care of.
At that time, the 62 Lesmo GEOfill turf was installed, characterized by three not inconsiderable peculiarities: immediate return to upright position during and after use, anti-abrasive fibers, resistant to UV rays and frost, and a natural and organic infill, perfectly eco-friendly capable of maintaining perfect drainage, constant humidity and a visual rendering very similar to a natural lawn.